{"id":2130,"date":"2026-11-17T09:00:00","date_gmt":"2026-11-17T08:00:00","guid":{"rendered":"https:\/\/www.applicon-it.eu\/?p=2130"},"modified":"2026-11-10T10:06:54","modified_gmt":"2026-11-10T09:06:54","slug":"production-and-operations-planning","status":"publish","type":"post","link":"https:\/\/www.applicon-it.eu\/en\/production-and-operations-planning\/","title":{"rendered":"From Production Planning to Planning the Entire Operation"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"2130\" class=\"elementor elementor-2130 elementor-2123 elementor-bc-flex-widget\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c833e70 e-flex e-con-boxed e-con e-parent\" data-id=\"c833e70\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a36ac75 elementor-widget elementor-widget-text-editor\" data-id=\"a36ac75\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Series: Digital Management of a&nbsp;Manufacturing Company | Part 2<\/strong><\/p>\n<h2>From Production Planning to Planning the Entire Operation<\/h2>\n<p>A production plan can be correct in terms of dates, operations and workstation capacities and still not be feasible in practice. The reason is often unavailable material, a&nbsp;missing tool, a&nbsp;conflict with maintenance, an outdated status of work in progress or insufficient internal logistics capacity.<\/p>\n<p>Production planning therefore cannot be limited to assigning operations to machines and workers. It must take into account all resources and constraints that affect the actual flow of an order through the company.<\/p>\n<p>This approach also changes the requirements placed on ERP, APS, MES, WMS and other operational systems. Each of them manages a&nbsp;different part of the information. For reliable planning, however, they must create a&nbsp;single, up-to-date picture of operations.<\/p>\n<h3>Production capacity is only one part of the plan<\/h3>\n<p>A basic production plan usually determines:<\/p>\n<ul>\n<li>what is to be produced,<\/li>\n<li>in what quantity,<\/li>\n<li>by what date,<\/li>\n<li>at which workstation,<\/li>\n<li>in what sequence the individual operations are to take place,<\/li>\n<li>what production capacity will be needed.<\/li>\n<\/ul>\n<p>To execute an order, other resources must also be available at the right time:<\/p>\n<ul>\n<li>input material,<\/li>\n<li>semi-finished products from previous operations,<\/li>\n<li>tools and fixtures,<\/li>\n<li>production and technical documentation,<\/li>\n<li>workers with the necessary qualifications,<\/li>\n<li>handling equipment,<\/li>\n<li>internal logistics capacity,<\/li>\n<li>storage locations,<\/li>\n<li>inspection and measuring equipment,<\/li>\n<li>operational production equipment.<\/li>\n<\/ul>\n<p>If the plan does not take some of these constraints into account, it works with only part of the operational reality.<\/p>\n<p>For example, the plan may correctly evaluate machine availability but not know that the required tool is being used on another order. According to ERP, material may be in stock but physically located elsewhere or waiting for incoming inspection. A&nbsp;workstation may have free capacity, but a&nbsp;service shutdown is scheduled during the planned operation.<\/p>\n<p>The result is a&nbsp;plan that is mathematically feasible but, once released to production, runs into constraints that were not included in the planning model.<\/p>\n<h3>What matters is the flow of the order through the entire operation<\/h3>\n<p>Production performance cannot be assessed only by the utilisation of individual machines or workstations. What matters is the entire flow of the order, from receipt of the order through technical preparation, purchasing, warehousing, production and quality control to shipping.<\/p>\n<p>An order can also lose time outside the production operation itself:<\/p>\n<ul>\n<li>waiting for documentation to be released,<\/li>\n<li>waiting for material,<\/li>\n<li>waiting for transport between workstations,<\/li>\n<li>waiting for a&nbsp;tool or fixture,<\/li>\n<li>waiting for a&nbsp;decision on a&nbsp;nonconformity,<\/li>\n<li>waiting for quality inspection,<\/li>\n<li>waiting for the next operation to be released,<\/li>\n<li>waiting for packing or shipping.<\/li>\n<\/ul>\n<p>Optimising individual workstations on their own may not reveal these delays. A&nbsp;company may have high utilisation of selected equipment and, at the same time, long lead times, high work in progress or frequent changes in priorities.<\/p>\n<p>To manage the entire flow, it is therefore necessary to monitor not only production times but also waiting, transfers, blockages and dependencies between activities.<\/p>\n<h3>The bottleneck may not be in a&nbsp;production operation<\/h3>\n<p>A bottleneck is often associated with a&nbsp;specific machine or workstation. In operations, however, it can also arise at the interface between departments or systems.<\/p>\n<p>Typical examples:<\/p>\n<ul>\n<li>material is recorded as in stock but is not ready at the workstation,<\/li>\n<li>technical documentation was not released in time,<\/li>\n<li>a design change was not reflected in production data,<\/li>\n<li>the required tool is not available,<\/li>\n<li>the workstation is waiting for first-article inspection,<\/li>\n<li>an operation was completed, but the information was not reflected in the plan,<\/li>\n<li>internal logistics cannot keep up with changes in order sequence,<\/li>\n<li>a nonconforming product blocks further progress and there is no decision on how to handle it.<\/li>\n<\/ul>\n<p>These constraints are often not visible when assessing production capacity alone. They only become apparent when the plan is compared with the actual progress of the order.<\/p>\n<p>That is why an end-to-end view is important. Planning must respect the interdependencies between production, warehousing, purchasing, technical preparation, maintenance, quality and shipping.<\/p>\n<h3>Internal logistics is part of the production plan<\/h3>\n<p>Internal logistics ensures the movement of material, semi-finished products, tools and finished goods between the warehouse, workstations and other parts of the operation. Its performance directly affects how usable production capacity is.<\/p>\n<p>If the plan does not account for the real capacity of internal logistics, situations may arise where:<\/p>\n<ul>\n<li>material is available but not delivered in time,<\/li>\n<li>a completed operation blocks the workstation because it has not been collected,<\/li>\n<li>work in progress piles up between operations,<\/li>\n<li>a change in order sequence causes an excessive number of unplanned transfers,<\/li>\n<li>workstations wait for material to be replenished,<\/li>\n<li>warehouse and production records do not match the physical status.<\/li>\n<\/ul>\n<p>Demands on logistics increase especially with frequent plan changes, smaller production batches, a&nbsp;high number of variants and limited space between workstations.<\/p>\n<p>Connected planning must therefore determine not only when an operation starts but also when individual resources and materials must be ready in the right place.<\/p>\n<h3>Maintenance and equipment condition affect real capacity<\/h3>\n<p>The capacity of production equipment is not determined solely by the shift calendar. It is affected by planned maintenance, current technical condition, failure frequency, changeover time and the availability of workers or tools.<\/p>\n<p>If the planning system does not work with maintenance information, it may schedule an order on equipment that is due to be shut down. If information about an unplanned breakdown is not passed on to APS or ERP in time, the next version of the plan may still work with capacity that does not exist.<\/p>\n<p>For planning, it is therefore necessary to distinguish between:<\/p>\n<ul>\n<li>nominal capacity,<\/li>\n<li>planned available capacity,<\/li>\n<li>currently usable capacity,<\/li>\n<li>capacity limited by maintenance, breakdowns or the unavailability of other resources.<\/li>\n<\/ul>\n<p>Information about the technical condition of equipment must be available at a&nbsp;time when the plan, priorities or order assignments can still be changed.<\/p>\n<h3>Tools, fixtures and documentation are limited resources<\/h3>\n<p>A production operation may depend on a&nbsp;specific tool, fixture, mould, gauge, CNC program or version of production documentation. Machine availability alone therefore does not provide sufficient information about whether an operation can be carried out.<\/p>\n<p>Depending on the nature of production, planning should also work with data on:<\/p>\n<ul>\n<li>the availability and location of tools,<\/li>\n<li>their service life and technical condition,<\/li>\n<li>reservation for a&nbsp;specific order,<\/li>\n<li>setup and adjustment,<\/li>\n<li>validity of technical documentation,<\/li>\n<li>availability of the required program,<\/li>\n<li>links to design or engineering changes,<\/li>\n<li>the need for calibration or inspection of gauges.<\/li>\n<\/ul>\n<p>This information may be split between ERP, MES, the maintenance system, tool management or PLM\/PDM. For planning, however, it must be available in an up-to-date and unambiguous form.<\/p>\n<h3>ERP, APS, MES and WMS have different roles<\/h3>\n<p>A manufacturing company usually does not manage planning with a&nbsp;single system. Individual solutions support different levels of management:<\/p>\n<ul>\n<li>ERP manages production orders, material requirements, dates, bills of materials, routings and financial aspects.<\/li>\n<li>APS creates a&nbsp;detailed schedule that takes capacity and other defined constraints into account.<\/li>\n<li>MES captures the actual progress of production, the status of operations and deviations from the plan.<\/li>\n<li>WMS manages the physical movement and location of material in the warehouse.<\/li>\n<li>The maintenance system records equipment condition, planned interventions and breakdowns.<\/li>\n<li>PLM or PDM can manage technical documentation and its changes.<\/li>\n<\/ul>\n<p>The division of functions differs from company to company. However, it must always be defined:<\/p>\n<ul>\n<li>which system is the primary source of a&nbsp;specific piece of information,<\/li>\n<li>where the data originates and where it is changed,<\/li>\n<li>how quickly a&nbsp;change is transferred to other solutions,<\/li>\n<li>who is responsible for its accuracy,<\/li>\n<li>how to proceed when systems differ.<\/li>\n<\/ul>\n<p>Without this definition, individual applications may work correctly on their own, but planning as a&nbsp;whole will not be reliable.<\/p>\n<h3>A change to the plan affects the entire operation<\/h3>\n<p>The production plan changes due to customer priorities, equipment failures, material unavailability, quality problems or deviations during production.<\/p>\n<p>Every change can affect:<\/p>\n<ul>\n<li>purchasing and material deliveries,<\/li>\n<li>warehouse preparation,<\/li>\n<li>internal logistics,<\/li>\n<li>staffing,<\/li>\n<li>tool preparation,<\/li>\n<li>the maintenance plan,<\/li>\n<li>subsequent production operations,<\/li>\n<li>quality control,<\/li>\n<li>shipping.<\/li>\n<\/ul>\n<p>Frequent rescheduling without evaluating these impacts leads to unstable operations. A&nbsp;new plan is created administratively, but individual departments do not have enough time or information to adapt to it.<\/p>\n<p>The company therefore needs to define:<\/p>\n<ul>\n<li>which events are a&nbsp;reason for rescheduling,<\/li>\n<li>who can change priorities,<\/li>\n<li>how the impacts of a&nbsp;change are evaluated,<\/li>\n<li>how the new plan is handed over to operations,<\/li>\n<li>which version of the plan is binding,<\/li>\n<li>how changes are communicated to downstream departments.<\/li>\n<\/ul>\n<p>Plan stability does not mean refusing changes. It means a&nbsp;managed procedure in which the reason for the change, its impacts and responsibility for carrying it out are known.<\/p>\n<h3>Local optimisation can worsen overall performance<\/h3>\n<p>Individual departments pursue different goals. Production may prefer long batches and fewer changeovers. The warehouse optimises the number of handling operations. Maintenance needs to keep service intervals. Sales strives for the fastest possible delivery. Finance monitors inventory and work in progress.<\/p>\n<p>Each of these goals is legitimate. If they are evaluated separately, however, improving one area can worsen the performance of the entire flow.<\/p>\n<p>For example:<\/p>\n<ul>\n<li>a larger production batch reduces the number of changeovers but increases inventory and lead time,<\/li>\n<li>postponing maintenance increases available capacity in the short term but creates a&nbsp;higher operational risk,<\/li>\n<li>maximising machine utilisation can increase work in progress before the next operation,<\/li>\n<li>frequently prioritising urgent orders can disrupt the stability of the entire plan.<\/li>\n<\/ul>\n<p>Operations planning therefore needs shared evaluation criteria. In addition to workstation utilisation, it is advisable to monitor, for example, on-time delivery, lead time, the level of work in progress, the number of plan changes or the occurrence of waiting between operations.<\/p>\n<h3>AI can support planning, but it needs a&nbsp;complete model of constraints<\/h3>\n<p>Analytical and AI tools can help evaluate plan alternatives, recognise recurring problems or estimate the risk of missing a&nbsp;deadline.<\/p>\n<p>The result, however, depends on whether the tool has correct information about:<\/p>\n<ul>\n<li>current work in progress,<\/li>\n<li>material availability,<\/li>\n<li>equipment condition,<\/li>\n<li>real production times,<\/li>\n<li>worker availability,<\/li>\n<li>logistics constraints,<\/li>\n<li>dependencies between operations,<\/li>\n<li>order priorities.<\/li>\n<\/ul>\n<p>If the model works only with machine capacity and ignores other operational constraints, it may propose alternatives that cannot be executed.<\/p>\n<p>Before using advanced planning or AI, it is therefore necessary to determine which factors actually affect the feasibility of the plan and whether sufficiently high-quality data about them is available.<\/p>\n<h3>What to review before developing production planning<\/h3>\n<p>Before introducing APS, expanding MES or changing the way planning is done, it is advisable to analyse:<\/p>\n<ul>\n<li>the rules by which the plan is currently created,<\/li>\n<li>which constraints the plan actually takes into account,<\/li>\n<li>where the plan most often diverges from reality,<\/li>\n<li>how often and for what reasons priorities change,<\/li>\n<li>which resources actually limit the flow of orders,<\/li>\n<li>how material availability is reflected in the plan,<\/li>\n<li>how maintenance, tools and worker qualifications are taken into account,<\/li>\n<li>whether internal logistics has information sufficiently in advance,<\/li>\n<li>how ERP, APS, MES, WMS and maintenance are connected,<\/li>\n<li>who is responsible for the accuracy of planning data,<\/li>\n<li>which indicators are used to evaluate the quality of the plan.<\/li>\n<\/ul>\n<p>The goal is not just to create a&nbsp;more detailed schedule. The result should be a&nbsp;plan that respects the real constraints of the operation and can be continuously updated based on verified data.<\/p>\n<h3>From planning operations to managing the entire flow<\/h3>\n<p>A production plan is reliable only if it matches the availability of all critical resources and the current situation in operations.<\/p>\n<p>Connecting production with material, logistics, maintenance, tools and actual work in progress makes it possible to assess the real feasibility of orders. At the same time, it provides a&nbsp;basis for a&nbsp;managed response to changes and operational deviations.<\/p>\n<p>The shift from production planning to operations planning therefore does not mean simply deploying a&nbsp;more advanced tool. It requires shared data, defined system roles, clear responsibilities and rules for plan changes.<\/p>\n<h3>Series: Digital Management of a&nbsp;Manufacturing Company<\/h3>\n<ul>\n<li><a href=\"https:\/\/www.applicon-it.eu\/en\/new-role-of-mes-production-data-decision-making\/\">Part 1: From Monitoring to Decision-Making: The New Role of MES in the Age of AI<\/a><\/li>\n<li><strong>Part 2: From Production Planning to Operations Planning<\/strong> (you are reading)<\/li>\n<li>Part 3: An ERP Project in a&nbsp;Manufacturing Company as Managing a&nbsp;Digital Ecosystem (coming soon)<\/li>\n<\/ul>\n<p><strong>Previous part:<\/strong> How MES connects planned values with the actual progress of production and why data quality determines the possibilities of planning, analytics and AI.<\/p>\n<p><strong>Next part:<\/strong> The third article focuses on managing an ERP project that connects multiple enterprise systems, suppliers, process owners and internal teams.<\/p>\n<h3>You may also be interested in<\/h3>\n<ul>\n<li><a href=\"https:\/\/www.applicon-it.eu\/en\/integrace-erp-systemu-kde-konci-erp-a-zacina-jiny-system\/\">ERP System Integration: Where Does ERP End and Another System Begin?<\/a><\/li>\n<li><a href=\"https:\/\/www.applicon-it.eu\/en\/what-your-erp-system-supplier-wont-tell-you-but-an-independent-consultant-will\/\">How to Decide on the Future Development of an ERP System<\/a><\/li>\n<li><a href=\"https:\/\/www.applicon-it.eu\/en\/services\/process-optimization\/\">Service: Process Optimization<\/a><\/li>\n<li><a href=\"https:\/\/www.applicon-it.eu\/en\/services\/erp-system-implementation\/\">Service: ERP Implementation Management and Oversight<\/a><\/li>\n<\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-60404b9 e-flex e-con-boxed e-con e-parent\" data-id=\"60404b9\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4e6b67c elementor-widget elementor-widget-text-editor\" data-id=\"4e6b67c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2>Does your production plan reflect the real constraints of your operation?<\/h2><p>AppliCon IT helps manufacturing companies review their planning approach, the links between ERP, APS, MES and WMS, and the availability of data needed to manage material, capacity, internal logistics and maintenance.<\/p><p>The outcome is identification of the points where the plan diverges from operational reality, together with recommendations for further process or system development.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a1e998b elementor-align-center elementor-widget elementor-widget-button\" data-id=\"a1e998b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.applicon-it.eu\/en\/contacts\/\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Book a&nbsp;consultation<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Available machine capacity does not yet mean that a&nbsp;production order can be executed. The plan must also work with material, tools, maintenance, logistics and the actual status of production.<\/p>\n","protected":false},"author":5,"featured_media":2119,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[33],"tags":[39,44,35,43,34,41,42],"class_list":["post-2130","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-manufacturing-and-digitalization","tag-aps","tag-capacity","tag-erp","tag-internal-logistics","tag-mes","tag-production-planning","tag-wms"],"_links":{"self":[{"href":"https:\/\/www.applicon-it.eu\/en\/wp-json\/wp\/v2\/posts\/2130","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.applicon-it.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.applicon-it.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.applicon-it.eu\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.applicon-it.eu\/en\/wp-json\/wp\/v2\/comments?post=2130"}],"version-history":[{"count":2,"href":"https:\/\/www.applicon-it.eu\/en\/wp-json\/wp\/v2\/posts\/2130\/revisions"}],"predecessor-version":[{"id":2135,"href":"https:\/\/www.applicon-it.eu\/en\/wp-json\/wp\/v2\/posts\/2130\/revisions\/2135"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.applicon-it.eu\/en\/wp-json\/wp\/v2\/media\/2119"}],"wp:attachment":[{"href":"https:\/\/www.applicon-it.eu\/en\/wp-json\/wp\/v2\/media?parent=2130"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.applicon-it.eu\/en\/wp-json\/wp\/v2\/categories?post=2130"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.applicon-it.eu\/en\/wp-json\/wp\/v2\/tags?post=2130"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}